RX 400h FWD V6-3.3L (3MZ-FE) Hybrid (2006)
c. Install the control cable to the control bracket.
NOTICE:
^
Make sure that the A claws on the clip are securely fit into the bracket holes.
^
Make sure that the cable is securely installed inside of the B claws of the clip.
d. Connect the park/neutral position switch connector.
e. Move the control shaft lever to the N position.
f.
Temporarily install the control cable to the control shaft lever with the nut.
g. Lightly push up the control cable end.
NOTICE: Do not push the control cable end excessively.
h. Release your hand from the control cable end and then fully tighten the nut.
Torque: 15 Nm (150 kgf-cm, 11 ft. lbs.)
3. INSTALL OIL COOLER TUBE SUB-ASSEMBLY (w/Oil Cooler)