RX 450h FWD V6-3.5L (2GR-FXE) Hybrid (2010)
Bolt (A) - Torque : 7.5 Nm (76 kgf-cm, 66 in-lbf)
Bolt (B) - Torque : 29 Nm (296 kgf-cm, 21 ft-lbf)
NOTICE:
Tighten the 2 bolts (A) first, and then the bolt (B).
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected See: Testing and
Inspection/Programming and Relearning/Repair Instruction - Initialization.
5. INSTALL REAR DECK FLOOR BOX See: Body and Frame/Interior Moulding / Trim/Headliner/Service and Repair/Removal and
Replacement/Installation
6. PERFORM INITIALIZATION
(a) Perform initialization See: Testing and Inspection/Programming and Relearning/Repair Instruction - Initialization.
7. INSPECT FOR AIR LEAK
(a) Inspect for air leaks See: Service Precautions/Suspension Control System.
8. INSTALL FRONT FLOOR COVER RH