Aviator 2WD V8-4.6L DOHC (2003)
2. Using the special tools, install the LH halfshaft bearing.
3. Using the special tools, install the halfshaft seals.
Item 6: Front Halfshaft Assembly Installation Note
1. Lubricate the outboard CV joint.
^
Pack the outboard CV joint with 185 grams (6.53 oz) of grease.
1
One-third of the grease must be installed in the joint with the remainder placed in the boot.
2
Spread the remaining grease evenly inside the boot.
2. Position the outboard halfshaft boot and the outboard boot clamps.
1
Position the boot.
2
Position the boot clamps.