Mark LT 2WD V8-5.4L VIN 5 (2007)
Remove the 1st/2nd gear shift gate.
9. Using a suitable punch in the spring pin bore, remove the 1st/2nd gear shift rail.
10. Using a suitable punch in the spring pin bore, remove the 3rd/4th gear shift gate and the 3rd/4th shift rail.
11. Remove the 1st/2nd gear shift fork and the 3rd/4th shift fork.
12. Using a suitable punch in the spring pin bore, remove the 5th/reverse shift gate and the 5th/6th reverse shift rail.