Navigator 2WD V8-5.4L (2007)
A4
Normal Operation
The clock receives battery voltage from the smart junction box (SJB) through circuit SBP14 (BN/RD). Ground for the clock is supplied through
circuit GD138 (BK/WH).
Possible Causes
-
Fuse
-
Circuit SBP14 (BN/RD) open
-
Circuit GD138 (BK/WH) open
-
Clock
-
SJB