lincoln Workshop Repair Guides

Lincoln Workshop Service and Repair Manuals

Power Distribution Relay > < Power Distribution Module|Service and Repair
Page 2
background image

5. Disconnect the 7 electrical connectors.
6. Remove the 2 bolts and the SJB.

Installation

1. Position the SJB and install the 2 bolts.

-

Tighten the screws to 2 Nm (18 lb-in).

2. Connect the 7 electrical connectors.
3. Position the RH A-pillar lower trim panel and install the pin-type retainer.
4. Install the glove compartment.
5. Connect the battery.

6. NOTE:  When successful, this step provides the calibration necessary for the SJB operation and clears DTCs B2477 and B106D. The clearing of

these DTCs indicate the calibration data has been successfully downloaded to the SJB.

Download the SJB configuration information from the scan tool to the SJB.

7. NOTE:  When successful, this step clears DTCs B2868, B2869, B2870 and B2871. The clearing of these DTCs indicates the SJB has recognized

the tire pressure sensors during the training procedure.

Train the tire pressure sensors.

8. NOTE:  DTC C2780 will not clear if any other DTCs are present in the SJB.

Carry out the SJB on-demand self-test by clearing DTCs and then retrieving DTCs to confirm all DTCs have been cleared.

Power Distribution Relay > < Power Distribution Module|Service and Repair