Navigator 4WD V8-5.4L (2010)
4. Attach the cooler line flusher red line to the transmission fluid cooler pressure tube quick connect fitting.
5. Attach the cooler line flusher blue line to the transmission fluid cooler return tube quick connect fitting.
6. Follow the equipment instructions to purge the transmission fluid cooler tubes and cooler prior to starting the flushing procedure.
7. Allow the transmission fluid cooling system to backflush for 10-15 minutes, then flush the transmission fluid cooler in a normal flow direction for
an additional 10-15 minutes.