lincoln Workshop Repair Guides

Lincoln Workshop Service and Repair Manuals

Right Side|Page 2391 > < Right Side
Page 2
background image

CAUTION:  Do not pull on the ignition wires as they may separate from the connector in the ignition wire boots.

4. Disconnect ignition wires from spark plugs (12405). Refer to Powertrain Management.
5. Remove ignition wire set and retainers from valve cover studs and move ignition wires out of the way.
6. Disconnect fuel charging wiring (9D930) from crankshaft position sensor (CKP)(6C315), A/C clutch (2884) ignition coil (12029) and radio

ignition interference capacitor (18801). Position harness out of the way.

7. Disconnect vent hose from evaporative emission canister purge valve (EVAP canister purge valve)(9C915) and position positive bakery cable out

of the way.

8. Remove positive crankcase ventilation valve (PCV valve)(6A666) from crankcase ventilation grommet (6A892) and move out of the way.
9. Remove bolts and stud bolts retaining valve cover (6582) to cylinder head. Remove valve cover.

INSTALLATION 

NOTE:  Valve cover must be installed and tightened to specification within five minutes of applying sealer.

1. Clean sealing surfaces of cylinder head, valve cover and engine front cover (6019) with Metal Surface Cleaner F4AZ-19A536-RA or equivalent

meeting Ford specification WSE-M5B392-A. Apply Silicone Gasket and Sealant F6AZ-19562-AA or equivalent meeting Ford specification
WSE-M4G323-A6 in both places where engine front cover meets cylinder head.

2. Position, and using Gasket and Trim Adhesive F3AZ-19B508-B or equivalent meeting Ford specification ESR-M11P17-A and ESE-M2G52-A,

glue new valve cover gasket (6584) into valve cover and install onto cylinder head.

3. Install bolts and stud bolts into valve cover. Tighten studs and bolts to 8-12 Nm (71-106 inch lbs.).
4. Install positive crankcase ventilation valve into crankcase ventilation grommet.
5. Connect vent hose to evaporative emission canister purge valve and position vent hose on valve cover studs.
6. Connect fuel charging wiring to valve cover studs, A/C clutch ignition coil, radio ignition interference capacitor and crankshaft position sensor.
7. Install ignition wire retainers on studs and connect ignition wires to spark plugs. Refer to Powertrain Management.
8. Position positive battery cable harness on RH cylinder head.
9. Install bolt retaining battery cable bracket to cylinder head.

10. Connect positive battery cable at power distribution box and harness (14516) and battery.
11. Connect battery ground cable.
12. Start engine and check for leaks.

Right Side|Page 2391 > < Right Side