5 L4-2.3L (2007)
Refrigerant Pressure Sensor / Switch: Testing and Inspection
REFRIGERANT PRESSURE SWITCH INSPECTION
1. Install the SST (gas charging set).
2. Disconnect the refrigerant pressure switch connector.
3. Verify the high-pressure side reading of the SST (manifold gauge) and continuity between the refrigerant pressure switch terminals B and C, A and
D.
-
If there is any malfunction, replace the refrigerant pressure switch.