mazda Workshop Repair Guides

Mazda 5 L4-23L Workshop Service and Auto Repair Manuals

Valve Clearance|Specifications|Page 2579 > < Valve Clearance|Specifications
Page 1
background image

Valve Clearance: Testing and Inspection

VALVE CLEARANCE INSPECTION [L3].) 

1. Remove the plug hole plate. 
2. Remove the battery cover. 
3. Disconnect the negative battery cable.
4. Disconnect the wiring harness.
5. Remove the ignition coils. 
6. Disconnect the Oil control valve (OCV) connector.
7. Remove the ventilation hose.
8. Remove the cylinder head cover.
9. Verify that the engine is cold.

10. Measure the valve clearance. 

1. Turn the crankshaft clockwise so that the No.1 piston is at TDC of the compression stroke. 

2. Measure the valve clearance at A in the figure. If the valve clearance is out of the standard value, adjust it. 

Standard valve clearance [Engine cold]

IN: 0.22 - 0.28 mm (0.0087 - 0.01101 inch) 
EX: 0.27 - 0.33 mm (0.0107 - 0.01129 inch) 

Note:  Make sure to note down the measured values for choosing the suitable replacement tappets.

3. Turn the crankshaft 360° clockwise so that the No.4 piston is at TDC of the compression stroke. 
4. Measure the valve clearance at B in the figure. If the valve clearance is out of the standard value, adjust it. 

Note:  Make sure to note down the measured values for choosing the suitable replacement tappets.

Standard valve clearance [Engine cold]

IN: 0.22 - 0.28 mm (0.0087 - 0.0110 inch) 
EX: 0.27 - 0.33 mm (0.0107 - 0.0129 inch) 

11. Install the cylinder head cover. 
12. Install the ventilation hose.
13. Connect the OCV connector.
14. Install the ignition coils. 
15. Connect the wiring harness.
16. Connect the negative battery cable.
17. Install the battery cover. 
18. Install the plug hole plate and bracket.

Valve Clearance|Specifications|Page 2579 > < Valve Clearance|Specifications