6 L4-2.5L (2010)
5. Set the main control valve body onto the solenoid control valve body.
6. Set the seal plate on the main control valve body.
7. Set the upper control valve body onto the main control valve body.
8. Hand-tighten the bolts shown in the figure. Each type of bolt has a different letter on its head.
Match the bolt letter with the letter stamped next to its installation hole on the valve body.
Bolts identification