626 L4-2184cc 2.2L SOHC F2 (1989)
5.
Slowly direct the water stream up from the deck lid to the quarter panel seam, then continue up each "C" pillar over the entire rear of vehicle.
Figure 14.
6.
Have assistant direct water along inner wheel well-to-quarter panel seam and spray complete underside of wheel well. Figure 15 and 16.