mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Fuel - Rough Idle Within 15 Seconds After Cold Start|Page 1476 > < Fuel - Rough Idle Within 15 Seconds After Cold Start|Page 1474
Page 5
background image

Green label) of the pressure regulator.

4)

Install the solenoid valve onto the solenoid bracket.

Installation of Wire Harness

2.

Installation of Wire Harness (with & without Turbo)

A.

Under Dashboard

1)

Install the control unit from the kit to lower left side of the E.C.U. (Emission Control Unit).

2)

Connect the single couplers (Black & Blue) from the wire harness of the kit.

3)

Connect the wire harness to the control unit.

4)

Connect the 2 ends of the wire harness of the E.C.U. at DEM-01.

5)

Install the ground wire with bolt (# 10) and tighten it.

6)

Fasten the wire harness with bands.

7)

Pass the 3 ends of the wire harness through the rubber seal in the firewall.

Fuel - Rough Idle Within 15 Seconds After Cold Start|Page 1476 > < Fuel - Rough Idle Within 15 Seconds After Cold Start|Page 1474