mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Evaporative Check Valve > < Diagram Information and Instructions|Page 3068
Page 5
background image

5.

Blow through the valve from port "B". Verify that the valve opens at 5.39-6.87 kPa (0.055-0.07 kg/sq cm 0.78-1.00 psi).

NOTE:  The test must be performed with the valve horizontal. Otherwise, the ball in the valve will move out of position and close the passage.

SEPARATOR

Fuel Vapor Separator

1.

Remove the separator.

2.

Visually check the separator for damage.

3.

Replace, if necessary.

Evaporative Check Valve > < Diagram Information and Instructions|Page 3068