626 V6-2496cc 2.5L DOHC (1995)
Main Relay (Computer/Fuel System): Testing and Inspection
INSPECTION
Operation check
Listen for operational sound of the main relay while cranking the engine.
Continuity Inspection
1. Remove the main relay.
2. Apply battery positive voltage (B+) and check continuity between terminals of the relay.
3. If not as specified, replace the main relay.