mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 3876 > < Initial Inspection and Diagnostic Overview|Page 3874
Page 4
background image

Connector End Views-Interior Lighting (Part 4)

Pinpoint Test 1

PINPOINT TEST 1: THE INTERIOR LAMP IS INOPERATIVE

Normal Operation

NOTE:  The smart junction box (SJB) is also known as the generic electronic module (GEM).

Voltage is supplied to the SJB/GEM through circuit (GY/R). The SJB/GEM fuse 13 (15A) supplies voltage to the interior lamp relay (integral to the
SJB/GEM). When any door is opened, the door ajar switch closes, signalling the SJB/GEM. The SJB/GEM monitors the door ajar circuits, and the
instrument panel dimmer switch input. Based on these inputs, the SJB/GEM will supply voltage to the interior lamp on circuit (G/L).

Possible Causes

-

Fuse

-

Wiring, terminals or connectors

-

Interior lamp

-

SJB

Initial Inspection and Diagnostic Overview|Page 3876 > < Initial Inspection and Diagnostic Overview|Page 3874