mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Engine Controls - Hard Cold Engine Start/Fuel Flooding|Page 654 > < Drivetrain - Limited Slip Differential Chatter/Shudder|Page 648
Page 1
background image

Oil Filter: All Technical Service Bulletins
Engine Controls - Hard Cold Engine Start/Fuel Flooding

01-012/5

2004-2005 B-SERIES TRUCKS - B2300 -
HARD START OR FLOODING DURING COLD
START - PCM REPROGRAMMING

APPLICABLE MODEL(S)/VINS

2004-2005 B2300

DESCRIPTION

Some 2004-2005 B2300 vehicles may exhibit a hard start, or a fuel flooding condition when the engine is cold. The condition can occur in ambient
temperatures of 20-70 F (-7 thru 21 C). The condition may also result in engine crankcase oil becoming oil becoming contaminated with fuel.

Customers having this concern should have their vehicle repaired using the following repair procedure.

REPAIR PROCEDURE

1.

Verify customer concern.

2.

Check condition of engine oil.

^

If contaminated with fuel, replace oil and filter. After oil and filter replacement, go to next step.

^

If not contaminated with fuel, go to next step.

3.

Reboot the WDS PTU to clear memory before reprogramming.

4.

Using WDS B35.5 or later software, reprogram the PCM to the latest calibration (refer to "Calibration Information" table) by following the
"Module Reprogramming" procedure.

NOTE:

^

Always update the WDS PTU first, then install the needed calibration file that WDS shows during PCM reprogramming. Go to "WDS
Calibration" on ESI and download the "update" file. If the PTU is not updated to the latest WDS calibration level, the calibration file will
not install into the PTU.

^

WDS shows the calibration part numbers after programming the PCM.

^

Please be aware that PCM calibration part numbers and file names listed in any Service Bulletin may change due to future releases of WDS
software, and additional revisions made to those calibrations for service related concerns.

^

When reprogramming a PCM, WDS will always display the "latest" calibration P/N available for that vehicle. If any calibration has been
revised/updated to contain new information for a new service concern/issue, it will also contain all previously released calibrations.

^

When performing this procedure, if the WDS PTU is not docked and connected to 115V-120V, we recommend that a battery charger be
installed on the vehicle battery and turned ON to a maximum charge of no more than 20 AMPS to keep the vehicle battery up to capacity.
If you exceed 20 AMPS, it will damage the WDS PTU. Also the external battery power supply cable should be connected to the vehicle
battery and the PTU.

^

If there is a communication error, attempt to communicate using a different scan tool such as a different WDS, NGS, NGS+ or VCM. If
communication cannot be established with any scan tool, perform voltage drop of PCM power and ground circuits. Also check that VREF
circuits.

^

Install an "Authorized Modification" label (P/N 9999-95-AMDC-97) with the new calibration information next to the Emission Control
sticker on the radiator support. The "Authorized Modification" label will inform technicians of the PCM calibration change if future repairs
are necessary.

5.

After performing the PCM reprogramming procedure, verify the repair by starting the engine and making sure there are no MIL illumination or
abnormal warning lights present.

NOTE:

Engine Controls - Hard Cold Engine Start/Fuel Flooding|Page 654 > < Drivetrain - Limited Slip Differential Chatter/Shudder|Page 648