B4000 2WD V6-4.0L SOHC (2003)
Connecting Rod: Specifications
Connecting Rod Nut
Install and tighten the connecting rod nuts finger tight.
Tighten the connecting rod nuts simultaneously in two stages:
^
Stage 1: Tighten 20 Nm (15 ft. lbs.).
^
Stage 2: Tighten 90 degrees.