B4000 2WD V6-4.0L SOHC (2003)
11. Connect the CKP sensor electrical connector.
12. Install the generator mounting bracket.
13. Connect the generator wiring.
14. Install the drive belt tensioner.
11. Connect the CKP sensor electrical connector.
12. Install the generator mounting bracket.
13. Connect the generator wiring.
14. Install the drive belt tensioner.