mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Constant Velocity Type|Page 2885 > < Constant Velocity Type|Page 2883
Page 5
background image

6. Position the inboard driveshaft. boot.

7. Install the CV joint on the driveshaft.

1. Line up the marks on the driveshaft and the CV joint.
2. Install the CV joint on the driveshaft.

8. Install the snap ring.

9. Lubricate the three CV joint needle bearings.

-

Use appropriate grease.

10. Fill the inboard CV joint housing with 235 grams of grease.

-

Use appropriate grease.

11. Position the CV joint housing onto the CV joint.

Note  Remove any excess grease from the inboard driveshaft. boot mating surface before positioning into place.

Constant Velocity Type|Page 2885 > < Constant Velocity Type|Page 2883