B4000 SE Cab Plus 4WD V6-4.0L OHV (1997)
5. Install and tighten the upper ball joint pinch bolt to 88 - 115 Nm (65 - 85 ft. lbs.).
NOTE: The camber/caster adjuster will seat itself during tightening of the bolt. Do not adjust the position.
Tie Rod Nut
1. Install the steering linkage.
2. Tighten the tie rod nut to 70 - 100 Nm (52 - 73 ft. lbs.).
3. Tighten the nut to align the next slot with the hole in the steering linkage.
4. Install a new cotter pin.