B Series Truck 4WD L4-2606cc 26L SOHC (1992) Maintenance Alignment Preliminary Checks
Alignment: Service and Repair
Toe-In
1.
loosen left and right tie rod locknuts.
2.
Turn both tie rods the same amount until specified adjustment is made. Both tie rods have righthand threads.
3.
Torque tie rod locknuts to 51-58 ft. lbs.