mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Intake Manifold|Specifications|Page 1621 > < Intake Manifold|Specifications|Page 1619
Page 5
background image

1. install the turbocharger.

Tightening torque
38 - 51 N.m (3.9 - 5.2 kgf.m, 29 - 37 ft.lbf)

2. Install the WU-TWC.
3. Install the front HO2S.

4. Tight the oil pipe installation bolt while the stopper of the oil pipe is faced to the turbocharger.

5. Install the oil pipes and, insert the oil hose until it reaches the stopper.

Wastegate Control Solenoid Valve Installation Note

Intake Manifold|Specifications|Page 1621 > < Intake Manifold|Specifications|Page 1619