mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Removal and Replacement|Page 3705 > < Removal and Replacement|Page 3703
Page 12
background image

9. Remove the tubular pin and O-ring.

Secondary Control Valve Body On-Vehicle Installation

1. Install the tubular pin and new O-rings to the transaxle case.

2. Install the secondary control valve body.

3. Tighten the bolts and GND as shown to install the secondary control valve body.

Tightening torque

-

8-10 Nm {82-101 kgf-cm, 71-88 in-lbf}

Bolt length measured from below the head

4. Connect each solenoid valve connector.

Removal and Replacement|Page 3705 > < Removal and Replacement|Page 3703