mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Intake Manifold|Specifications|Page 1947 > < Intake Manifold|Specifications|Page 1945
Page 6
background image

2. Install the vacuum hose.
3. Install the drive belt.
4. Install the oil level gauge pipe. (See OIL PAN REMOVAL/INSTALLATION.)
5. Install the fuel delivery pipe cover in the order in the figure.

Tightening torque:  17-23 N.m {1.8-2.3 kgf.m, 13-16 ft.lbf}

6. Install the high pressure fuel pump bracket and the EGR pipe bracket.

Charge Air Cooler Installation Note

Charge air cooler installation Note

1. Install the charge air cooler bracket.

Tightening torque:  42-48 N.m {4.3-2.8 kgf.m, 31-35 ft.lbf}

2. Install the charge air cooler.

Tightening torque:  18.6-25.5 N.m {1.90-2.60 kgf.m, 13.8-18.8 ft.lbf}

3. install the charge air cooler cover.

CAUTION:  When installing the charge air cooler cover, be careful not to damage the charge air cooler cover clips.

Tightening torque:  7.9-10.7 N.m {81-109 kgf.cm, 70-94 in.lbf}

4. install the duct.

Throttle Body Installation Note

Intake Manifold|Specifications|Page 1947 > < Intake Manifold|Specifications|Page 1945