Mazdaspeed6 L4-2.3L Turbo (2006)
5. Measure the segment groove depth of commutator.
-
If not within the minimum specification, undercut the grooves to the standard depth.
Standard depth: 0.4-0.6 mm {0.016-0.023 in}
Minimum depth: 0.2 mm {0.008 in}
Magnetic switch
1. Inspect for continuity between terminals S and M using an ohmmeter.
-
If there is no continuity, replace the magnetic switch.
2. Inspect for continuity between terminal S and the body using an ohmmeter.
-
If there is no continuity, replace the magnetic switch.
3. Verify that there is no continuity between terminals M and B using an ohmmeter.
-
If there is continuity, replace the magnetic switch.