Millenia L V6-2.5L DOHC (1997)
Purge Solenoid Valve: Testing and Inspection
PURGE SOLENOID VALVE
1. Remove the purge solenoid valve.
2. Apply battery positive voltage to terminal A and ground terminal B of the solenoid valve. Verify that air flows as shown below.
3. If not as specified, replace the purge solenoid valve.