mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Output Gear Bearing Preload|Page 2965 > < Band Servo Piston <--> [Band Apply Servo, A/T]|Specifications|Page 2958
Page 1
background image

Carrier Bearings: Adjustments
Output Gear Bearing Preload

NOTE:  Use the Special Service Tools (SSTs) illustrated to measure and adjust the output gear bearing preload.

1. Align the bearing cover with guide bolts as shown.
2. Press the bearing cover in by using the SST.
3. Remove the guide bolts and install the bearing cover installation bolts. Tighten to 10.8 - 13.7 Nm (96 - 121 inch lbs.) 
4. Mount the converter housing onto the SST (transaxle hanger).
5. Remove the bearing race and adjustment shims from the bearing housing using a pin punch and hammer.

6. Set the output gear into the converter housing.

Output Gear Bearing Preload|Page 2965 > < Band Servo Piston <--> [Band Apply Servo, A/T]|Specifications|Page 2958