Millenia S V6-2.3L DOHC (Miller cycle) (2000)
3. Tighten the bolts in 2 or 3 steps in the order shown.
Tightening torque: 23.1 - 25.9 Nm (2.35 - 2.65 kgf-m, 17.0 - 19.1 ft. lbs.)
4. Put a paint mark on each bolt head.
5. Using the marks as a reference, tighten the bolts by turning each 85° - 95° in the sequence shown.
6. Further tighten each bolt by turning another 85° - 95°.
4. Fit the knock sensor harness into the drill hole A on the cylinder block.
5. Suspend the engine using the SST.
6. Remove the No.3 engine mount.
Camshaft Installation Note
Caution: There Is a stamp mark and a scribed line on the camshaft gear. Use the scribed line for the timing mark.
1. Apply clean engine oil to the camshaft journals, camshaft lobes, and camshaft gears.