Millenia S V6-2.3L DOHC (Miller cycle) (2000)
Canister Purge Control Valve: Testing and Inspection
1. Remove the pressure control valve.
2. Attach an air hose to the SST.
3. Set the SST to port A and plug port B as shown in the figure.
4. Verify that there is airflow from port D when pressure of +0.98 kPa {+7.4 mmHg, +0.29 inHg} is applied to port A.
-
If there is no airflow, replace the pressure control valve.
5. Set the SST to port B, C and plug port A as shown in the figure.
6. Verify that there is airflow from port D when pressure of +0.98 kPa {+7.4 mmHg, +0.29 inHg} is applied to port B, C.
-
If there is no airflow, replace the pressure control valve.
7. Set the SST to port A, C and plug port B as shown in the figure.
8. Verify that there is no airflow from port D when pressure of +0.98 kPa {+7.4 mmHg, +0.29 inHg} is applied to port A, C.
-
If there is airflow, replace the pressure control valve.
9. Set the SST to port D and plug port B.
10. Verify that there is airflow from port A when pressure of +0.98 kPa {+7.4 mmHg, +0.29 inHg} is applied to port D.
-
If there is no airflow, replace the pressure control valve.