Millenia S V6-2.3L DOHC (Miller cycle) (2000)
Canister Purge Solenoid: Testing and Inspection
1. Remove the purge solenoid valve.
Specification
2. Apply B+ to terminal A and ground terminal B of the solenoid valve. Verify that air flows as shown.
-
If not as specified, replace the purge solenoid valve.