Millenia S V6-2.3L DOHC (Miller cycle) (2000)
Main Relay (Computer/Fuel System): Testing and Inspection
1. Remove the cruise actuator.
2. Remove the main relay.
Specification
3. Apply B+ and inspect continuity between terminals of the main relay using an ohmmeter.
-
If not as specified, replace the main relay.