MPV ES V6-2.5L DOHC (2001)
2. Press the trailing arm bushing in from the inner side of the trailing arm to the outer side using the SSTs.
Lateral Rod Installation Note
1. Face the direction mark backward toward the outside of the vehicle, and install the lateral rod.