MPV LX V6-2.5L DOHC (2000)
Battery: Testing and Inspection
Step 1 - 3
Battery
1. Inspect the battery as shown in the procedure.
Load Test Chart
Battery Positive Voltage With Load
Back-up Current
1. Verify that the ignition switch is off and that the ignition key has been removed.
2. Disconnect the negative battery cable.
CAUTION: Operating electrical loads while measuring the back-up current can damage the circuit tester.
3. Measure the back-up current between the negative battery terminal and the negative battery cable.
1. If the current exceeds the maximum, remove the fuse in the main fuse block and in the fuse block one by one while measuring the back-up
current.
2. Inspect and repair harnesses and connectors of the fuse at which the current reduces.
Back-up current
20 mA max.