mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Steering > < Component Locations|Page 2560
Page 1
background image

Power Steering Pressure Switch: Testing and Inspection

POWER STEERING PRESSURE (PSP) SWITCH INSPECTION

Inspection of Continuity

NOTE:  Perform the following test only when directed.

1. Inspect as follows if power steering is inoperative:

-

POWER STEERING FLUID INSPECTION (See POWER STEERING FLUID INSPECTION)

2. Disconnect the PSP switch connector.
3. Start the engine.

4. Inspect for continuity between PSP switch terminal and GND using an ohmmeter. 

-

If not as specified, replace the PSP switch.

-

If PSP switch is okay but PID value is out of specification, perform the "Circuit Open/Short Inspection".

5. Reconnect the PSP switch connector.

Circuit Open/Short Inspection 

Open circuit

-

If there is no continuity, the circuit is open. Repair or replace the harness.
-

Power circuit (PSP switch connector terminal and PCM connector terminal 4C through common connector.)

-

GND circuit (PSP switch GND circuit.)

Short circuit

-

If there is continuity, the circuit is shorted. Repair or replace the harness.
-

PSP switch connector terminal and PCM connector terminal 4C through common connector to GND.

Steering > < Component Locations|Page 2560