mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Fuel - Rough Idle Within 15 Seconds After Cold Start|Page 1527 > < Fuel - Rough Idle Within 15 Seconds After Cold Start|Page 1525
Page 11
background image

Green label) of the pressure regulator.

4)

Install the solenoid valve onto the solenoid bracket.

Installation of Wire Harness

2.

Installation of Wire Harness (with & without Turbo)

A.

Under Dashboard

1)

Install the control unit from the kit to lower left side of the E.C.U. (Emission Control Unit).

2)

Connect the single couplers (Black & Blue) from the wire harness of the kit.

3)

Connect the wire harness to the control unit.

4)

Connect the 2 ends of the wire harness of the E.C.U. at DEM-01.

5)

Install the ground wire with bolt (# 10) and tighten it.

6)

Fasten the wire harness with bands.

7)

Pass the 3 ends of the wire harness through the rubber seal in the firewall.

Fuel - Rough Idle Within 15 Seconds After Cold Start|Page 1527 > < Fuel - Rough Idle Within 15 Seconds After Cold Start|Page 1525