Protege L4-2.0L DOHC (2003)
2. Loosen locknut D and turn rod C to align the holes in the fork and in the pedal.
3. Install the clevis pin and the spring pin.
4. Tighten locknut D.
Tightening torque 24 - 34 Nm (2.4 - 3.5 kgf-m, 18 - 25 ft. lbs.)
5. Check the pedal height and the brake light operation.
Pedal-to-floor Clearance Inspection
1. Start the engine and depress the brake pedal with a force of 588 N (60 kgf, 132 lbs.)
2. Verify that the distance from the floor panel to the pedal pad center is as specified when the pedal is depressed.
^
If the distance is less than specified, check for the air in brake system.
Specification
ZM: 88 mm (3.5 inch) min.
FS: 84 mm (3.3 inch) min.