Protege L4-2.0L DOHC (2003)
Catalytic Converter: Testing and Inspection
WARM UP THREE-WAY CATALYTIC CONVERTER (WU-TWC) INSPECTION
NOTE: Make sure that no HO2S DTC has been detected. If detected, this inspection cannot be used for WU-TWC inspection.
1. Connect the WDS or equivalent and monitor PIDs as following.
-
Monitor the WU-TWC using O2S11 PID for upstream HO2S and O2S12 PID for downstream HO2S.
2. Begin to monitor the appropriate PIDs.
3. Drive the vehicle for 10 min at 65 - 96 km/h {40 - 60 mph} to ensure the WU-TWC reaches operating temperature.
4. Stop the vehicle and leave in a safe place.
5. Let the engine at idle.
6. Record PIDs for 1 min.
7. Select the appropriate PIDs and read the graph.
8. Count the number of times (inversions) that the upstream HO2S graph line actually crosses the 0.5 V line.
9. Count the number of times (inversion) that the downstream HO2S graph line actually crosses the 0.5 V line.
NOTE: Do not count the number of peaks. Refer to the illustration.
10. Using the following equation, calculate the value of ratio.
Equation
RATIO = Upstream HO2S inversion + downstream HO2S inversion
-
If the ratio is 2 or more or no downstream HO2S inversion, the WU-TWC is functioning properly.
-
If the ratio is less than 2, the WU-TWC is not functioning properly. Replace the WU-TWC.
Upstream HO2S graphline example