mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Power Steering Pressure Switch > < Component Locations|Page 469
Page 3
background image

2. Connect the SST (104 Pin Breakout Box) to the PCM as shown.
3. Tighten the connector attaching screw.

Tightening torque
7.9 - 10.7 N.m {80 - 110 kgf.cm, 69.5 - 95.4 in.lbf}

4. Inspect for an open or short circuit in the following wiring harnesses by probing the applicable sensor and SST (104 Pin Breakout Box) terminals

with ohmmeter leads.
-

If there is an open or short circuit, repair or replace wiring harnesses.

-

If there is no open or short circuit, replace the HO2S.

Open circuit
-

Control circuit (HO2S connector terminal C and ignition switch (IG1) circuit through common connector)

-

GND circuit (HO2S connector terminal D and PCM connector terminal 94 (Front), 93 (Rear))

Short circuit
-

Control circuit (HO2S connector terminal C and ignition switch (IG1) circuit through common connector to GND)

-

GND circuit (HO2S connector terminal D and PCM connector terminal 94 (Front), 93 (Rear) to GND)

5. Reconnect the HO2S connector.

Power Steering Pressure Switch > < Component Locations|Page 469