Protege L4-2.0L DOHC (2003)
Shift Solenoid: Testing and Inspection
On Vehicle
Inspection of Resistance (On-vehicle)
Connector and pin Identification
Solenoid Resistance Table
1. Measure the resistances between the following terminals.
^
If any resistances are out of specifications, inspect the ground, then perform the operation and the part inspection.
ATF temperature: -40 - 150°C (-40 - 302°F)
Inspection of Operation
Note:
^
When inspecting the pressure control solenoid, connect the GND connection to the GND terminal (I terminal) of the pressure control solenoid
inside the solenoid valve connector.
^
Do not apply voltage for more than 3 seconds.
1. Apply B+ to terminal A, B, C, F, or G and battery negative voltage to GND, and verify that a click sound is heard from each solenoid.
^
If the click sound is not heard from each solenoid, replace solenoids.
2. Apply B+ to terminal D and battery negative voltage to terminal 1, and verify that a click sound is heard from solenoid.
^
If the "click" is not heard, replace the solenoid valve.