mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Ignition Coil|Testing and Inspection|Page 2345 > < Ignition Coil|Testing and Inspection
Page 2
background image

FP/1.8

6. Connect the SSTs (NGS tester) shown in the figure.

NOTE:  
-

Using the signal simulation of SST apply a pseudo-pulse to the ignition coil and inspect its operation.

-

Disconnect the ignition coil terminal 1C and 2C from the connectors in advance.

7. Connect the negative battery cable.
8. Turn the ignition switch to ON.
9. Prepare the SST (NGS tester) in the following procedure.

1. Move the cursor to DIGITAL MEASUREMENT SYSTEM.
2. Press the TRIGGER key to enter this selection.

3. Move the cursor to SIGNAL SIMULATION.
4. Press the TRIGGER key to enter this selection.

5. Move the cursor and set the following:

Set value
FREQUENCY: 50 Hz

Ignition Coil|Testing and Inspection|Page 2345 > < Ignition Coil|Testing and Inspection