mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Transmission Speed Sensor, A/T|Testing and Inspection|Page 2618 > < Neutral Switch Inspection|Page 2614
Page 1
background image

Transmission Speed Sensor: Testing and Inspection

INPUT/TURBINE SPEED SENSOR INSPECTION 

Note:  Input signals of the input/turbine speed sensor can be inspected with a NGS tester.

Resistance Inspection 
1. Disconnect the negative battery cable.
2. Remove the air cleaner component.

3. Disconnect the input/turbine speed sensor 

4. Measure the resistance between the terminals of the input/turbine speed sensor.

-

If not as specified, replace the input/turbine speed sensor.

Resistance
250 -  600 ohms (ATF temperature: -40 - 160° C (-40 - 320° F)) 

5. Connect the input/turbine speed sensor connector.
6. Install the air cleaner component.
7. Connect the negative battery cable.

Transmission Speed Sensor, A/T|Testing and Inspection|Page 2618 > < Neutral Switch Inspection|Page 2614