mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Evaporator Case|Testing and Inspection|Page 3306 > < Evaporator Case|Testing and Inspection|Page 3304
Page 2
background image

1. Disassemble in the order indicated in the table.

CAUTION:  If moisture or foreign material enters the refrigeration cycle, cooling ability will be lowered and abnormal noise will occur. Always
immediately plug all open fittings after removing any refrigeration cycle parts to keep moisture or foreign material out of the cycle.

2. Assemble in the reverse order of disassembly.

Expansion Valve Assembly Note

1. Apply compressor oil to the O-rings and connect the joint.
2. Tighten the nut of the joint by hand.
3. Tighten the joint with the specified torque with a spanner and torque wrench.

4. Assemble the heat-sensing tube as shown in the figure.

5. Route the capillary tube as shown in the figure.
6. Verify that the capillary tube is not in the shaded zone

Evaporator Case|Testing and Inspection|Page 3306 > < Evaporator Case|Testing and Inspection|Page 3304