mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Using the SST (104 Pin Breakout Box)|Page 1680 > < Using the SST (104 Pin Breakout Box)
Page 2
background image

Circuit Open/Short Inspection

1. Remove the PCM.

2. Connect the SST (104 Pin Breakout Box) to the PCM as shown.
3. Tighten the connector attaching screw.

Tightening torque:
7.9 - 10.7 N.m {80 - 110 kgf.cm, 69.5 - 95.4 in.lbf}

4. Inspect for an open or short circuit in the following wiring harnesses by probing the applicable sensor and SST (104 Pin Breakout Box) terminals

with ohmmeter leads.
-

If there is an open or short circuit, repair or replace wiring harnesses.

-

If there is no open or short circuit, replace the fuel tank pressure sensor.

Open circuit
-

Fuel tank pressure signal circuit (Fuel tank pressure sensor connector terminal B and PCM connector terminal 62)

-

Reference voltage circuit (Fuel tank pressure sensor connector terminal C and PCM connector terminal 90)

-

GND circuit (Fuel tank pressure sensor connector terminal A and PCM connector terminal 91)

Short circuit
-

Fuel tank pressure signal circuit (Fuel tank pressure sensor connector terminal B and PCM connector terminal 62)

-

Reference voltage circuit (Fuel tank pressure sensor connector terminal C and PCM connector terminal 90)

5. Reconnect the fuel tank pressure sensor connector.

Using the SST (104 Pin Breakout Box)|Page 1680 > < Using the SST (104 Pin Breakout Box)