mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

On-Vehicle|Page 2469 > < Shift Solenoid A, B and C (Duty-Cycle Type) Description|Page 2466
Page 1
background image

Shift Solenoid: Testing and Inspection
On-Vehicle

SOLENOID VALVES INSPECTION 

Inspection of Resistance (On-vehicle) 
1. Disconnect the negative battery cable.
2. Remove the fresh-air duct and air cleaner component.

3. Disconnect the solenoid valve connector.

4. Measure the resistances between the following terminals.

-

If any resistances are out of specifications, inspect the ground, then perform the operation and the part inspection.

5. Connect the solenoid valve connector.
6. Install the air cleaner component and fresh-air duct.
7. Connect the negative battery cable.

Inspection of Operation 
1. Disconnect the negative battery cable.
2. Disconnect the solenoid connector.

Note: 
-

When inspecting the pressure control solenoid, connect the GND connection to the GND terminal (I terminal) of the pressure control solenoid
inside the solenoid valve connector.

-

Do not apply voltage for more than 3 seconds.

3. Apply B+ to terminal A, B. C, F. or G and battery negative voltage to GND, and verify that a click sound is heard from each solenoid.

-

If the click sound is not heard from each solenoid, replace solenoids.

On-Vehicle|Page 2469 > < Shift Solenoid A, B and C (Duty-Cycle Type) Description|Page 2466