RX7 2RTR-1308cc 1.3L MFI (1991)
4. Apply lithium based grease to the shaded areas as shown in the figure.
Installation
INSTALLATION
Hub Nut
Install the hub nut and adjust the bearing preload.
1. Tighten the nut and then turn the hub and plate 2 or 3 times to seat the bearing.
Tightening torque:
20-29 Nm (2.0-3.0 m-kg, 14-22 ft-lb)
2. Loosen the nut until it can be turned by hand.
3. Attach a pull scale to a hub bolt and measure the frictional force.
4. Tighten the locknut until the reading (initial turning torque.) reaches the specified amount. Then insert the set cover, and secure with a new cotter
pin.
Preload:
Frictional Force Plus 3.9-9.8 N (0.4-1.0 kg, 0.9-2.2 lb)
Speed Sensor