RX8 2RTR-1.3L (2006)
29. Install the insulator.
Tightening torque 8-11 N-m (82-112, kgf-cm, 72-97 in.lbf)
30. Install the catalytic converter.
31. Install the rear tunnel member.
32. Install the front tunnel member.
33. Connect the negative battery cable.
34. Install the battery cover.
35. Install the engine cover.
36. Inspect TR switch operation. (See Transmission Range (TR) Switch Inspection [SJ6A-EL] See: Testing and Inspection/Component Tests and
General Diagnostics/[SJ6A-El] Automatic Transmission/Transaxle/Transmission Range (TR) Switch Inspection