mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 4884 > < Initial Inspection and Diagnostic Overview|Page 4882
Page 7
background image

Step 6 - 10

Step 11

Normal Operation

The roof opening panel module receives voltage on circuit (BR/O) when the ignition key is in the ACC or ON position. The roof opening panel module
is grounded through circuit (B). When the roof opening panel switch is pressed, circuit (B) and circuit (W) are connected for open/tilt down or circuit
(B) and circuit (V) are connected for close/tilt up. The roof opening panel module controls the roof opening panel motor by directing power and ground
on circuit (O) and circuit (R) to the motor.

Initial Inspection and Diagnostic Overview|Page 4884 > < Initial Inspection and Diagnostic Overview|Page 4882