Tribute 4WD L4-2.3L Hybrid (2008)
PINPOINT TEST 7: THE DEMAND LAMPS ARE INOPERATIVE
Normal Operation
The smart junction box (SJB) supplies voltage to the demand lamps on circuit (Y/G). The demand lamps are grounded through circuit (B/GY).
Possible Causes
-
Fuse
-
Wiring, terminals or connectors
-
SJB
Diagnostic Procedure
CAUTION: Use the correct probe adapter(s) when making measurements. Failure to use the correct probe adapter(s) may damage the connector.
Step 1-Step 3
Pinpoint Test 8: An Individual Demand Lamp Is Inoperative
PINPOINT TEST 8: AN INDIVIDUAL DEMAND LAMP IS INOPERATIVE
Normal Operation
Circuit (Y/G) provides voltage to each demand lamp when the battery saver relay is activated. The demand lamps are grounded through circuit (B/GY).
The battery saver function of the smart junction box (SJB) deactivates the voltage to the demand lamps after time-out.