190E 2.3 (201.028) L4-2.3L (102.985) (1987)
9 The cable should move in the tube with a max. force of 50 N. Carry out test by means of a spring scale.
10 Fully insert cable in the tube and pull in the electric drive gearing by operating the sliding roof switch in direction of "open".
11 Further installation takes place in reverse order.